Place of Origin: | China |
---|---|
نام تجاری: | CBFI |
گواهی: | ISO, CE |
Model Number: | TV |
Minimum Order Quantity: | 1 set |
قیمت: | USD 1~10000000 |
Packaging Details: | wooden case or Bubble film |
Delivery Time: | 30 days after the deposit |
Payment Terms: | T/T, L/C, Western Union, MoneyGram |
Supply Ability: | 50 to 60 sets/ month |
Condition: | Brand new | Output: | 1 ton to 30 tons |
---|---|---|---|
Tube ice diameter: | 22mm, 28m, 35mm | Machine shipping: | one 20 feet container or one 40 feet container |
Compressor: | Semi hermetic type or screw type | Control: | Germany Siemens |
Electric accessories brand: | LG and Schneider | Expansion valves: | Denmark Danfoss |
Solenoid valves: | Italy castal | ||
برجسته: | Tube Ice Machine,Ice Tube Maker,Ice Tube Maker |
CBFI Stainless steel evaporator, Large refrigerant tank, Denmark Danfoss expansion valves Tube Ice Machine
Model | Ice Making Capacity | Rated Power | Circulationg Water Pump Power | Cooling Water Pump Capacity | Cooling Fan Capacity | Ice Cutter Motor | Machine Dimension | Weight of Machine |
---|---|---|---|---|---|---|---|---|
No. | Ton/24h | Kw | Kw | Kw | Kw | Kw | WxHxL(mm) | KG |
TV10 | 1.0 | 4.28 | 0.55 | 1.1 | 0.18 | 0.75 | 1100x900x1760 | 900 |
TV20 | 2.0 | 7.77 | 0.55 | 1.5 | 0.37 | 0.75 | 1250x1000x1950 | 1200 |
TV30 | 3.0 | 12.33 | 1.1 | 1.5 | 0.56 | 0.75 | 1400x1100x2200 | 1500 |
TV50 | 5.0 | 21 | 1.5 | 2.2 | 0.75 | 1.5 | 1600x1400x2250 | 1800 |
TV100 | 10.0 | 29.2 | 1.5 | 4 | 1.5 | 1.5 |
1200x1200x3100 2300x1550x1800 |
3500 |
TV150 | 15.0 | 49 | 2.2 | 5.5 | 1.5 | 1.5 |
1500x1200x4500 2700x1950x2250 |
4250 |
TV200 | 20.0 | 58.5 | 2.2 | 5.5 | 2.2 | 2.2 |
1600x1300x4700 3100x2200x2250 |
6500 |
TV300 | 30.0 | 87.6 | 2.2 | 15 | 2.2 | 2.2 |
3000x2200x2500 2200x1900x6200 |
7200 |
Installation:
1). Installing by the user: we will tested and install well the machine before shipment, all necessary spare parts, operation manual and CD are provided to guide the installation.
2).Installing by our engineers:
(1) We can send our engineer to assist the installation and provide technical support and train your workers. The end-user provide accommodation and round-trip ticket for our engineer.
(2) Before our engineer arrived in your site, the installation place, electricity, water and installation tools should be ready. Meanwhile, we will provide you a Tool List with the machine when delivery.
(3) All spare parts are provided according to our standard. During installation period, any shortage of parts due to the actual installation site, the buyer is required to afford the cost, such as water pipes.
(4) 2~ 3 workers are required to assist the installation for big project.